BTSE will be conducting blockchain maintenance on April 22, 2026, which will affect deposits and withdrawals for tokens on certain chains:
Affected Blockchains
- Tezos, AB, Viction, Harmony, Avalanche, Vana, Optimism (OP Mainnet), Scroll, Kusama Asset Hub, Polkadot Asset Hub, Kaia, Zano, Algorand, Kaspa, ZKsync Era, BounceBit, PlatON, Base, Moonbeam, Sonic, Story Protocol, MultiversX, ZIGChain, XRP Ledger (XRPL), StableChain, Cardano, Terra Classic, Terra 2.0, Cosmos Hub, Merlin Chain, Metis, XDC Network, Dash, Juno Network, Ordinals (Bitcoin), Runes (Bitcoin), Litecoin, Liquid Network (Bitcoin), and Monero.
Key Timeline and Details
- The scheduled blockchain maintenance is on April 22 from 2:30 PM (UTC+8) to 5:30 PM (UTC+8).
- While deposits and withdrawals for tokens on the above chains will remain available, users may experience longer processing times.
For any further questions, please contact us at support@btse.com.
Regards,
Team BTSE






